NextDecade's RGLNG terminal under construction with massive red and yellow cranes spread out across the large site

Heading Level 1

Heading Level 2

Heading Level 3

Heading Level 4

Paragraph. Heading level 5 and 6 are not used.

  • List Item 1
  • List Item 2
  • List Item 3
  • List Item 4
  1. Ordered List Item 1
  2. Ordered List Item 2
  3. Ordered List Item 3
  4. Ordered List Item 4

#002060

#D64303

#00893E

#F37139

#4C4C4C

#EFEFEF

#C13C03

NextDecade's RGLNG terminal under construction with massive red and yellow cranes spread out across the large site

Media Left

RGLNG Phase 1 is de-risked by fully-wrapped, lump-sum, turnkey engineering, procurement and construction contracts and Bechtel’s track record of successful LNG completions.

Liquefaction trains under construction and in development at RGLNG share a proven design and utilize established technologies and equipment from industry-leading suppliers.

Media Right

RGLNG Phase 1 is de-risked by fully-wrapped, lump-sum, turnkey engineering, procurement and construction contracts and Bechtel’s track record of successful LNG completions.

Liquefaction trains under construction and in development at RGLNG share a proven design and utilize established technologies and equipment from industry-leading suppliers.

NextDecade's RGLNG terminal under construction with massive red and yellow cranes spread out across the large site

Card Title

Description about what this card is about

Card Title

Description about what this card is about

Card Title

Description about what this card is about